ANALISA RENCANA PROSES DAN ESTIMASI WAKTU PEMESINAN SUPPORT FITTINGS DARI AIRBUS A380
Tight competition pushed the manufacturing industries to function effective and efficient ways. That goal can be achieved using CAD/CAM/CNC system. PT. Dirgantara Indonesia at the same way were using CATIA V5 R19 and VERICUT for CAD/CAM/CAE system. Parts were designed, analysed and modified so the o...
Saved in:
Main Authors: | , ANGGIH ANDREAS TAMA, , Handoko, ST., MT. |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/131761/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72264 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Universitas Gadjah Mada |
相似書籍
-
The rise and fall of the Airbus A380
由: Singapore Management University
出版: (2022) -
The rise and demise of Airbus A380
由: GENG, Xuesong, et al.
出版: (2021) -
Airbus A380 : a risk management framework
由: Appasaheb Naikal
出版: (2009) -
STUDI AERODINAMIKA KONFIGURASI HIGH LIFT DEVICES OPTIMUM DARI PENAMPANG SAYAP PESAWAT AIRBUS A380
由: Romana, Windy -
Estimasi biaya parametrik berbasis activity based costing untuk produk pemesinan prismatik
由: , WIDIASTUTI, Indah, et al.
出版: (2009)