ANALISA RENCANA PROSES DAN ESTIMASI WAKTU PEMESINAN SUPPORT FITTINGS DARI AIRBUS A380
Tight competition pushed the manufacturing industries to function effective and efficient ways. That goal can be achieved using CAD/CAM/CNC system. PT. Dirgantara Indonesia at the same way were using CATIA V5 R19 and VERICUT for CAD/CAM/CAE system. Parts were designed, analysed and modified so the o...
Saved in:
Main Authors: | , ANGGIH ANDREAS TAMA, , Handoko, ST., MT. |
---|---|
Format: | Theses and Dissertations NonPeerReviewed |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
Subjects: | |
Online Access: | https://repository.ugm.ac.id/131761/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=72264 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
PENGEMBANGAN MEKATRONIKA FIXTURES PADA PROSES PEMESINAN PRODUK KOPLING METERAN AIR
by: Abyan, Farras
by: Abyan, Farras
Similar Items
-
The rise and fall of the Airbus A380
by: Singapore Management University
Published: (2022) -
The rise and demise of Airbus A380
by: GENG, Xuesong, et al.
Published: (2021) -
Airbus A380 : a risk management framework
by: Appasaheb Naikal
Published: (2009) -
STUDI AERODINAMIKA KONFIGURASI HIGH LIFT DEVICES OPTIMUM DARI PENAMPANG SAYAP PESAWAT AIRBUS A380
by: Romana, Windy -
Estimasi biaya parametrik berbasis activity based costing untuk produk pemesinan prismatik
by: , WIDIASTUTI, Indah, et al.
Published: (2009)