KAJIAN DOKUMEN INSTRUKSI KERJA DAN PENERAPANNYA DI LAPANGAN (STUDI KASUS PADA PROYEK PEMBANGUNAN JEMBATAN IRONAYAN)
completed within A project generally has the goal to be the right cost, right quality, on time and done safely. One attempt to reach the project goal is by doing each job with work instructions so that work can be done efficiently and effectively. The Regulation of the Minister of Public Works No. 0...
Saved in:
Main Authors: | , MOCH. AFAN ASADI, , Toriq A. Ghuzdewan, S.T., MSCE |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2014
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/127551/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=67812 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
ANALISIS PROGRES PEKERJAAN MULTI-PROYEK:
Studi Kasus Pada Proyek Pembangunan Rumah Massal Perumahan Hyarta Residence
由: , SAGARASENJA KARTIKA PUTRA, et al.
出版: (2014) -
KAJIAN TEKNIS DAN ANALISA HARGA SATUAN PEKERJAAN AKTUAL PEMASANGAN UNIT PRACETAK GELAGAR TIPE I BENTANG 40 METER Studi Kasus Proyek Peningkatan Jembatan Ironayan
由: , YOGI HANINDITO, et al.
出版: (2014) -
METODOLOGI PEMBANGUNGAN ABUTMENT JEMBATAN PROYEK PEMBANGUNAN JEMBATAN DOUBLE TRACK KERETA CIREBON-KROYA
由: , AHMAD FUAD HABIBI, et al.
出版: (2013) -
Analisis sistem jaringan kerja pada proyek pembangunan jembatan
由: , SARANGA, Hary Lebang, et al.
出版: (2001) -
Evaluasi dokumen-dokumen perencanaan pembangunan daerah Kabupaten Buru, 2002-2006
由: , PULHEHE, Fatum, et al.
出版: (2007)