TINGKAT TUNTUTAN KERJA ANALISIS HUBUNGAN , KOMPETENSI SDM DAN MANAJEMEN PROYEK TERHADAP KUALITAS, BIAYA DAN WAKTU PENYELESAIAN PROYEK: STUDI KASUS DI PT LEN INDUSTRI (Persero)
This study aims to determine the relationship between the project performance, which compossed of quality, cost and time, and the exogenous constructs that influence which consist of the level of work demands, competence and project management in PT Len Industri (Persero). As the object of this stud...
Saved in:
Main Authors: | , Widyo Isworo, , Dr. Adi Djoko Guritno, MSIE |
---|---|
格式: | Theses and Dissertations NonPeerReviewed |
出版: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
主題: | |
在線閱讀: | https://repository.ugm.ac.id/120512/ http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=60543 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
ANALISIS PENERAPAN MANAJEMEN PROYEK UNTUK MENINGKATKAN KETEPATAN WAKTU PENYELESAIAN PROYEK
由: , Rony Kristianto Wibowo, ST, et al.
出版: (2012) -
UPAYA PENCAPAIAN PENYELESAIAN PROYEK TEPAT WAKTU PADA PROYEK PENINGKATAN JALAN DAN PENGGANTIAN JEMBATAN PROPINSI JAWA BARAT
由: Hendrarto, Agus -
Strategi pelaksanaan proyek pembangunan jalan tol pada lahan yang belum bebas :: Studi kasus pada kontraktor di proyek jalan tol Cinere Jagorawi Jakarta dan proyek jalan tol Waru Juanda Surabaya
由: , INDRARTO, Dono, et al.
出版: (2009) -
PERHITUNGAN BIAYA OPTIMASI DENGAN MEMPERCEPAT KURUN WAKTU PELAKSANAAN PROYEK
由: PIPIT NOVITA, 049314378
出版: (2000) -
Analisis hubungan antara alasan, faktor kesuksesan dan keuntungan kemitraan pada proyek konstruksi
由: , SUHARYANA, Prapta, et al.
出版: (2006)