Legality Of Guarantee Ban Clause Within Build Operate Transfer Project By Local-Owned Enterprises
In the process of implementing development, somehow a government has not insufficient fund to build infrastructures which have already been planned. During the process, the existence of private parties are required to be investors which are able to fund the government’s infrastructure plan through B...
Saved in:
Main Authors: | , |
---|---|
格式: | Article PeerReviewed |
語言: | English English English |
出版: |
PalArch Foundation
2020
|
主題: | |
在線閱讀: | https://repository.unair.ac.id/117295/1/3.%20A.pdf https://repository.unair.ac.id/117295/3/3.%20S.pdf https://repository.unair.ac.id/117295/7/3.%20V.pdf https://repository.unair.ac.id/117295/ https://archives.palarch.nl/index.php/jae/article/view/951 https://archives.palarch.nl/index.php/jae/article/view/951 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
因特網
https://repository.unair.ac.id/117295/1/3.%20A.pdfhttps://repository.unair.ac.id/117295/3/3.%20S.pdf
https://repository.unair.ac.id/117295/7/3.%20V.pdf
https://repository.unair.ac.id/117295/
https://archives.palarch.nl/index.php/jae/article/view/951
https://archives.palarch.nl/index.php/jae/article/view/951