Legality Of Guarantee Ban Clause Within Build Operate Transfer Project By Local-Owned Enterprises

In the process of implementing development, somehow a government has not insufficient fund to build infrastructures which have already been planned. During the process, the existence of private parties are required to be investors which are able to fund the government’s infrastructure plan through B...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: Illona Zerlinda, -, Faizal Kurniawan, -
التنسيق: مقال PeerReviewed
اللغة:English
English
English
منشور في: PalArch Foundation 2020
الموضوعات:
الوصول للمادة أونلاين:https://repository.unair.ac.id/117295/1/3.%20A.pdf
https://repository.unair.ac.id/117295/3/3.%20S.pdf
https://repository.unair.ac.id/117295/7/3.%20V.pdf
https://repository.unair.ac.id/117295/
https://archives.palarch.nl/index.php/jae/article/view/951
https://archives.palarch.nl/index.php/jae/article/view/951
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!