Legality Of Guarantee Ban Clause Within Build Operate Transfer Project By Local-Owned Enterprises
In the process of implementing development, somehow a government has not insufficient fund to build infrastructures which have already been planned. During the process, the existence of private parties are required to be investors which are able to fund the government’s infrastructure plan through B...
محفوظ في:
المؤلفون الرئيسيون: | , |
---|---|
التنسيق: | مقال PeerReviewed |
اللغة: | English English English |
منشور في: |
PalArch Foundation
2020
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://repository.unair.ac.id/117295/1/3.%20A.pdf https://repository.unair.ac.id/117295/3/3.%20S.pdf https://repository.unair.ac.id/117295/7/3.%20V.pdf https://repository.unair.ac.id/117295/ https://archives.palarch.nl/index.php/jae/article/view/951 https://archives.palarch.nl/index.php/jae/article/view/951 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
الانترنت
https://repository.unair.ac.id/117295/1/3.%20A.pdfhttps://repository.unair.ac.id/117295/3/3.%20S.pdf
https://repository.unair.ac.id/117295/7/3.%20V.pdf
https://repository.unair.ac.id/117295/
https://archives.palarch.nl/index.php/jae/article/view/951
https://archives.palarch.nl/index.php/jae/article/view/951