TECHNICAL ANALYSIS OF THE MINE DEWATERING SYSTEM DESIGN BASED ON EXTREME RAINFALL FOR ACCELERATING IN-PIT DUMP AT PIT ABC, PT XYZ
The coal mining company, PT XYZ, requires acceleration of the in-pit dump at pit ABC, located in the southern zone of the ABC sump area at an elevation of 24 meters above sea level. To support this need, an analysis of a mine dewatering system plan appropriate to the field conditions is necessary. O...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/85528 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
成為第一個發表評論!