OPTIMIZATION OF PT XYZ NICKEL LATERITE OPEN PIT MINE USING PIT OPTIMIZER AND HILL OF VALUE (HOV) OPTIMIZATION STRATEGY
Determining the optimal pit shell and mining parameters to achieve multidimensional and multidisciplinary corporate goals is a tough strategic challenge. In an effort to solve this problem, multidimensional solutions and methods are carried out that consider various mining parameters simultaneous...
Saved in:
Main Author: | Armanda, Mico |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85140 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF OPEN PIT MINING OPTIMIZATION AT NICKEL ORE MINING PT. XYZ
by: GUSTIANA FIRMANSYAH, TEDDY -
STUDY OF OPEN PIT MINING OPTIMIZATION AT GOLD ORE MINING PT XYZ
by: Laksmi Utaminingsih, Citra -
OPTIMIZATION AND SCHEDULING OF OPEN PIT MINING IN LIMESTONE MINING AT PT XYZ IN SOUTH KALIMANTAN
by: Fitra Mulyadi, Fauzan -
OPTIMIZATION AND SCHEDULING OPEN PIT MINING AT PT XYZ CLAY MINING IN SOUTH KALIMANTAN
by: Usama -
PIT OPTIMIZATION AND SCHEDULING COAL MINES PT XYZ
by: Adjie Pramudya, Danung