PROJECT CAPITAL RATIONING USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS & MONTE CARLO SIMULATION (CASE STUDY TAMBORA OIL DEVELOPMENT)

To prolong field production time, company needs to find a most profitable method to produce oil in gas field which currently has no artificial list infrastructure installed. One of possible options is using Progressive Cavity Pump or PCP in the well to lift oil from down hole to surface. PCP is driv...

全面介紹

Saved in:
書目詳細資料
主要作者: Nadrul Jamal, M
格式: Theses
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/69949
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!