STUDI PENINGKATAN EFISIENSI PENGOPERASIAN TURBIN GAS PEMBANGKIT LISTRIK PT CPI
<b></i>Abstract :</b><i><p align=\"justify\"> <br /> PT CPI is currently operating 21 units of Gas Turbine Generator to generate electric power required for its operation in exploring and producing crude oil. Current gas turbine generator operation prac...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/4648 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|