PRODUCTION OPTIMIZATION IN ZURI GAS FIELD WITH TYPE CARBONATE RESERVOIR
The Zuri gas field was discovered in 1972 by drilling a Z-3 exploration well that penetrated Peutu carbonate reservoir. The field is in the process of developing gas projects to fulfill the gas sales commitment to PT Pertamina (Persero). During the 2017-2018 period, three new wells have been drilled...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/25467 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |