REMAINING RESERVE CALCULATION OF COMMINGLE COMPLETION AND MULTILAYERED GAS RESERVOIR IN X FIELD
Along with the rising of world oil price, the level of gas demand is also growing up. Various methods are use to improve and accelerate production, one of them is commingle completion. Commingle completion is effective to increase production, particularly for reservooir with relatively low productiv...
محفوظ في:
المؤلف الرئيسي: | WILZA (NIM : 22211311), MEDIKA |
---|---|
التنسيق: | Theses |
اللغة: | Indonesia |
الوصول للمادة أونلاين: | https://digilib.itb.ac.id/gdl/view/20273 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
INFLOW PERFORMANCE RELATIONSHIP PADA RESERVOIR MULTILAYER DRY GAS YANG DIPRODUKSI SECARA COMMINGLE
بواسطة: Malrin, Engelina -
Accuracy of material balance applied to two-layered commingled gas reservoirs
بواسطة: Piyanun Jitchaiwisut
منشور في: (2010) -
Application of the layered stabilized flow model to estimate the original gas in place of multi-layered commingled gas reservoirs
بواسطة: Anie Lyn Balbin-Gardner
منشور في: (2003) -
RESERVOIR CHARACTERIZATION AND RESERVE CALCULATION AT SOKA FIELD, MUDA FORMATION, EAST NATUNA BASIN
بواسطة: Verdinov Simanjuntak, Marchel -
Perforation strategy for multilayered gas reservoirs
بواسطة: Ronasak Momin
منشور في: (2012)