Euapunpong, T. T., & Jokkaw, N. (2012). The selection of construction method for concrete segmental bridge in Thailand: A case study of MRT purple line (contract 2). Chulalongkorn University.
استشهاد بنمط شيكاغوEuapunpong, Thiparat Thoothong, و Noppadon Jokkaw. The Selection of Construction Method for Concrete Segmental Bridge in Thailand: A Case Study of MRT Purple Line (contract 2). Chulalongkorn University, 2012.
MLA استشهادEuapunpong, Thiparat Thoothong, و Noppadon Jokkaw. The Selection of Construction Method for Concrete Segmental Bridge in Thailand: A Case Study of MRT Purple Line (contract 2). Chulalongkorn University, 2012.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.